Acolyte RibbonLyte in Channel with Slide-In Stand Uživatelský manuál Strana 3

  • Stažení
  • Přidat do mých příruček
  • Tisk
  • Strana
    / 6
  • Tabulka s obsahem
  • KNIHY
  • Hodnocené. / 5. Na základě hodnocení zákazníků
Zobrazit stránku 2
All artwork and images copyright Acolyte Industries Inc.
Use or reprinting prohibited unless explicitly approved by Acolyte Industries.
INSTALLATION -- STEPS 1-4
1
3
2
4
Space your tiltable stands every meter and
make marks where the holes in the stand are
to mark your screw locations. If the channel
length is shorter than 1 meter, use two
tiltable stands placed several inches from
the end of edge of the channel.
Screw the Slide-In Tilt Stand (A) into place
using the appropriate screws (B).
Drill a pilot hole for the mounting clip screws
at each of the marks you have made along
the mounting path.
Slide Channel (C) into Slide-In Tilt Stands
(A) so that the channel is held in place.
PAGE 2
(A)
(C)
(A)
(B)
Zobrazit stránku 2
1 2 3 4 5 6

Komentáře k této Příručce

Žádné komentáře